Noront Resources

High-grade Ni-Cu-Pt-Pd-Au-Ag-Rh-Cr-V discoveries in the "Ring of Fire" NI 43-101 Update (March 2011): 11.0 Mt @ 1.78% Ni, 0.98% Cu, 0.99 gpt Pt and 3.41 gpt Pd and 0.20 gpt Au (M&I) / 9.0 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inf.)
in response to Sum4All's message

I think the point was to underline the hypocrisy and how it's always someone else's fault when it comes to the FN.

Meanwhile, mines are obligated to go through rigorous EAs but everything and anything is being dumped in the FN run landfill.

Rather, they could except responsibility. They don't have to except the bottled water. They can choose to redirect some of the infrastructure money since the water treatment facility is FN owned etc.

And they're always using styrofoam too! It just confounds me...

Please login to post a reply
TheNestHasLanded
City
Rank
Treasurer
Activity Points
1032
Rating
Your Rating
Date Joined
02/10/2015
Social Links
Private Message
Noront Resources
Symbol
NOT
Exchange
TSX-V
Shares
326,029,076 As of Jan 17, 2017
Industry
Metals & Minerals
Create a Post