Noront Resources

High-grade Ni-Cu-Pt-Pd-Au-Ag-Rh-Cr-V discoveries in the "Ring of Fire" NI 43-101 Update (March 2011): 11.0 Mt @ 1.78% Ni, 0.98% Cu, 0.99 gpt Pt and 3.41 gpt Pd and 0.20 gpt Au (M&I) / 9.0 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inf.)
I have to ask
over 16 years ago
0
in response to jimmied's message

I have seen a bunch of figures on the drilling rates, though I will state up front that I think miskealp has a better handle on this than I do.

I seem to recall reading that the new drills will drill between 50-70 meters/shift. (Though this depends on the hardness of the rock, and I have seen it suggested that they can drill even more.)

For my (albeit simplified) calculations, I assumed two holes/week. If we take your suggestion of 120 meters/day and a hole depth of 300 meters then we have about 2.5 days per hole. Add in a day for transport (though if I recall correctly, they can be set up in eight hours) and we are at more-or-less two holes per week.

Please login to post a reply
seawind
City
Montreal
Rank
President
Activity Points
2041
Rating
Your Rating
Date Joined
01/04/2008
Social Links
Private Message
Noront Resources
Symbol
NOT
Exchange
TSX-V
Shares
326,029,076 As of Jan 17, 2017
Industry
Metals & Minerals
Create a Post