Noront Resources

High-grade Ni-Cu-Pt-Pd-Au-Ag-Rh-Cr-V discoveries in the "Ring of Fire" NI 43-101 Update (March 2011): 11.0 Mt @ 1.78% Ni, 0.98% Cu, 0.99 gpt Pt and 3.41 gpt Pd and 0.20 gpt Au (M&I) / 9.0 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inf.)
in response to Dutchmen's message

Dutch: With the project approved I have a vague memory of company going ahead with Eagle anyway but at slower pace and lower capacity. The necessary equipment and components for mine construction they would bring in on winter roads.

Mine could operate in limited capacity, probably more limited by insufficient energy ( diesel generators?) then any thing else, stock piling metals for shipment out, again on winter roads. All the time waiting for that all season road.

Any how that is what I read way back from somewhere, however those seem like desperate measures if feasible. I say IF feasible because most mines it would not be economical, however our nickel ore's value might make it so even with these metal prices.

As you say, we are hoping. Ed.

Please login to post a reply
Edgy
City
southern Ontario (often in Europe)
Rank
President
Activity Points
37538
Rating
Your Rating
Date Joined
07/20/2006
Social Links
Private Message
Noront Resources
Symbol
NOT
Exchange
TSX-V
Shares
326,029,076 As of Jan 17, 2017
Industry
Metals & Minerals
Create a Post