Noront Resources

High-grade Ni-Cu-Pt-Pd-Au-Ag-Rh-Cr-V discoveries in the "Ring of Fire" NI 43-101 Update (March 2011): 11.0 Mt @ 1.78% Ni, 0.98% Cu, 0.99 gpt Pt and 3.41 gpt Pd and 0.20 gpt Au (M&I) / 9.0 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inf.)
in response to curt22go's message

Here is what I think. FWIW. It takes twice the time we would normaly expect to get results, First it is slow drilling, second there is logging and cutting and bagging then add in that they are not flying out cores daily but in groups, some could take a month or more, depending on if the geologists need, from when the core comes from the ground to it arives at the assey office and then it joins the line. We had a winter program that was missing and other things were happening. The project in my mind has been proved and the exploration continues but was not priority for six months or more. Now, as the other stuff gets completed they have gone back to more exploration to increase the length of mine life. Soon we will start hearing about winter roads I hope and the official runway, then costs will be lower and gung-ho exploration and infrastructure can be done. Meanwhile its turtle against the hare. The hare being Cliffs.

Please login to post a reply
crazytrade
City
Rank
Vice President
Activity Points
15690
Rating
Your Rating
Date Joined
11/17/2009
Social Links
Private Message
Noront Resources
Symbol
NOT
Exchange
TSX-V
Shares
326,029,076 As of Jan 17, 2017
Industry
Metals & Minerals
Create a Post