Noront Resources

High-grade Ni-Cu-Pt-Pd-Au-Ag-Rh-Cr-V discoveries in the "Ring of Fire" NI 43-101 Update (March 2011): 11.0 Mt @ 1.78% Ni, 0.98% Cu, 0.99 gpt Pt and 3.41 gpt Pd and 0.20 gpt Au (M&I) / 9.0 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inf.)
1
in response to IAMSUDBURY's message

I think it's a very routine practise, even if it's not as often mentioned in an announcement. They pretty much have to stop drilling during freeze-up, or the equipment will be frozen into the ground. After the ground is solid, they go back onto the frozen surface. Fixed wing aircraft can't safely operate during freeze-up either. Most camps use the opportunity to take an extended Christmas break. It's best for morale, too.

Lar

Please login to post a reply
hoov
City
Millbrook ON
Rank
President
Activity Points
54560
Rating
Your Rating
Date Joined
06/14/2008
Social Links
Private Message
Noront Resources
Symbol
NOT
Exchange
TSX-V
Shares
326,029,076 As of Jan 17, 2017
Industry
Metals & Minerals
Create a Post