How about High Lighting ALL the Important data in that part of the Jan. 23rd, 2009 NOT NR.
See the portion respecting AT12 and the 5.5 meters HIGH GRADE Mineralization.
Is this part of the (or another Conduit) Conduit carrying the Highly Valued Mineralization?
Why do so much Intensive drilling with 2 Drills, ALL Winter long in this area?
Also note that 70m more on Eagle1 is ~ 25 % more added to the Value there as well!
Old Joe
Here is your Jan. 23rd, 2009 NR with the 5.5 meters also placed in BOLD:
TORONTO, Jan. 23 /CNW/ - Noront Resources Ltd. ("Noront or the Company") (TSX Venture: NOT) is pleased to present assay results from its base metal exploration activities in the McFaulds Lake area of northern Ontario in the James Bay Lowlands.
EXPLORATION HIGHLIGHTS
- Hole NOT-08-44, an extension to Eagle One, averaged 4.21% Nickel, 2.14% Copper, 0.35 g/t Platinum and 6.30 g/t Palladium over 28.8 metres, including 14.1 metres of higher grade averaging 7.46% Nickel and 3.65% Copper.
- Hole NOT-08-2G11 drilled on the AT12 anomaly encounters widespread nickel/copper PGE mineralization over 122.9 meters grading 0.56% Nickel, 0.29% Copper, 1.06 grammes/tonne TPM, including 5.5 metres averaging 2.38% Nickel, 3.05% Copper, 0.92 g/t Platinum, 2.62 g/t Palladium and 0.22 g/t Gold.
EAGLE ONE DRILL RESULTS
As previously announced (see press release dated November 10, 2008), while testing for the north-south striking dike or conduit beneath and around the Eagle One deposit, drill hole NOT-08-44 encountered massive sulphide mineralization 70 metres vertically below holes NOT-08-28 and NOT-08-32.