Noront Resources

High-grade Ni-Cu-Pt-Pd-Au-Ag-Rh-Cr-V discoveries in the "Ring of Fire" NI 43-101 Update (March 2011): 11.0 Mt @ 1.78% Ni, 0.98% Cu, 0.99 gpt Pt and 3.41 gpt Pd and 0.20 gpt Au (M&I) / 9.0 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inf.)
in response to Cinema Show's message
Goodheart_r's post was deleted but not flagged as a violation so I don't know who deleted it. I have no way of knowing if it is accurate or not but as speculation here is what had Goodheart_r posted.

"The Chinese engineering study is completed. The costing of the material list from the engineering study has been contracted out. The Chinese bankable feasibility study will be finished and ready to be presented to The People's Bank of China by the end of December. This means we can expect funding announcements from the end of December on, probably within the first two months of 2017."

... Been There
Please login to post a reply
Been There
City
Rank
President
Activity Points
20398
Rating
Your Rating
Date Joined
10/12/2007
Social Links
Private Message
Noront Resources
Symbol
NOT
Exchange
TSX-V
Shares
326,029,076 As of Jan 17, 2017
Industry
Metals & Minerals
Create a Post