Noront Resources

High-grade Ni-Cu-Pt-Pd-Au-Ag-Rh-Cr-V discoveries in the "Ring of Fire" NI 43-101 Update (March 2011): 11.0 Mt @ 1.78% Ni, 0.98% Cu, 0.99 gpt Pt and 3.41 gpt Pd and 0.20 gpt Au (M&I) / 9.0 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inf.)
in response to crazytrade's message
CT:- I think the ramp will speed up too. Paul S. Told me at the recent AGM that the FS timeline would be met. The time lost through delayed permits , for example, would be made up via already proven but new drilling techniques. If required, he said that huge machinery/ bulldozers would be cut up; helecoptered in; reassembled on site. He told me this at the recent AGM. I spoke to A . Coutts at same AGM just before talking to Semple, Couts confirmed to me that the FS timeline would be met. He also said that very large construction company such as the one that has built/ still building the Boston tunnel could do it. Coutts said it is the same company which was hired to build the raglan ni mine when Coutts was in charge of building it, These people can do anything to any timeline. "It's just engineering, said Semple" to me. So ...... All is possible , including increased drilling of the exploration kind. While ramp/ mine building, Peter
Please login to post a reply
Peter Marshall
City
Rank
President
Activity Points
4863
Rating
Your Rating
Date Joined
12/21/2007
Social Links
Private Message
Noront Resources
Symbol
NOT
Exchange
TSX-V
Shares
326,029,076 As of Jan 17, 2017
Industry
Metals & Minerals
Create a Post