High-grade Ni-Cu-Pt-Pd-Au-Ag-Rh-Cr-V discoveries in the "Ring of Fire" NI 43-101 Update (March 2011): 11.0 Mt @ 1.78% Ni, 0.98% Cu, 0.99 gpt Pt and 3.41 gpt Pd and 0.20 gpt Au (M&I) / 9.0 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inf.)

On Nov 2, 2009, Noront awarded a contract to a very reputable international engineering firm, SNC Lavelin, to do a transportation and infrastructure analysis. The terms of reference in the release were:

The study is intended to be in two phases with the first phase to be completed in the first quarter of 2010. The first phase will evaluate all options and recommend a preferred route and method of all season access into the site. The first phase will also define a work program required to minimize the transportation risks in support of a Feasibility Study. Assuming successful completion of the early phases and the subsequent field work, the Feasibility Study on Infrastructure and Transportation will be completed by the fourth quarter 2010.

With four months into the study, and a month to go in the quarter, we should be getting some info soon. Anyone going to the PDAC should ask when we can hear.

Please login to post a reply
CMP
City
NL
Rank
President
Activity Points
9407
Rating
Your Rating
Date Joined
03/25/2008
Social Links
Private Message
Noront Resources
Symbol
NOT
Exchange
TSX-V
Shares
326,029,076 As of Jan 17, 2017
Industry
Metals & Minerals
Create a Post