Silver Falcon Mining

Welcome to the Silver Falcon Mining HUB on AGORACOM (Edit this Message from the "Fast Facts" Section)
in response to Garick's message

Leech system, heard it is made down under and it takes 90 days to build but up to 90 to get here by boat. So roughly six months costs I think about 900k. Wonder if they received the permit yet? If i was them I'd pull out the 1,000 tons from those veins and hit a few hot zones and show the public the hot zones to trigger the GOLD FEVER!

Please login to post a reply
drill jammer
City
Rank
Treasurer
Activity Points
462
Rating
Your Rating
Date Joined
01/11/2013
Social Links
Private Message
Silver Falcon Mining
Symbol
SFMI
Exchange
OTCBB
Shares
202,565,218 class A (3.88M- B)
Industry
Metals & Minerals
Create a Post