in response to fazer's message

The operator and its partners also plan to complete the Gentilly No. 2 horizontal well. In addition to the target middle Utica interval, an analysis of the drilling logs indicates the horizontal leg has been partly drilled in the lower Utica interval. The completion program will include testing of both the middle and lower intervals within the Utica formation with a total of five stage fracs. Questerre anticipates results will provide important technical data about stimulation of these intervals. Completion operations are scheduled for the end of the second quarter............................

Completion operations are scheduled for the end of the second quarter............................

DOES IT MEANS "RESULTS DATA" ARE SCHEDULED FOR THE END OF THE SECOND QUARTER?? OR IT MEANS ONLY "END OF OPERATIONS"?

ROCCO? ANYONE?

Thanks. Life

Please login to post a reply
lifenergy
City
Ravenna (Italy)
Rank
Treasurer
Activity Points
1522
Rating
Your Rating
Date Joined
08/15/2008
Social Links
Private Message
Questerre Energy Corporation
Symbol
QEC
Exchange
TSX
Shares
291,324,457 Oct17/2016
Industry
Energy & Environment
Website
Create a Post