HPQ-Silicon Resources Inc.

Exclusive global partnership puts HPQ-Silicon Resources in a position to turn Quartz project into lowest cost supplier to solar industry.

I searched the Quebec Lobbyists register for HPQ silicon on this website https://www.lobby.gouv.qc.ca/servicespublic/consultation/ConsultationCitoyen.aspx

 and I found out that HPQ registered on Nov 25, 2016 and below is the french text followed by a Google translation:

Nous travaillons avec la société montréalaise PyroGenesis Canada Inc au développement d’une technologie unique, le PUREVAPTM QRR (Patent Pending), technologie qui permet la transformation de Quartz de faible pureté (SiO2 < 99 %) en silicium métal de très hautes pureté (99.9999% Si), matériel de base pour la fabrication des panneaux solaires. Les résultats des tests de laboratoires ayants démontré que le procédé fonctionnent, nous avançons le projet à la prochaine étape de développement, soit la validation du procédé à une échelle industriel. En plus de valider la commercialité du projet, l’usine pilote va servir de bac d’essai pour valider le fait que le procédé devrait réduire la production de Co2 de 75% lors de la production de silicium métal de très hautes pureté (99.9999% Si) versus les procédés traditionnel disponible sur le marché. Pour atteindre cette objectifs, nous avons mandaté PyroGenesis pour la construction d’une usine pilote de 200 tonnes par années basé sur notre technologie PUREVAPTM QRR (Patent Pending). Les couts totaux de la construction sont $ 4 950 000 divisé ainsi : • $ 4 430 000 pour l’achat des équipements de l’usine pilote, et • $ 520,000 pour le paiement des salaires et les coûts direct de fonctionnement de l’usine durant la période de rodage à chaud des équipements. La construction de l’usine pilote, son assemblage et son opération se fera à Montréal, dans les locaux même de PyroGenesis. Durant la phase de construction des équipements, en plus de l’équipe de 5 chercheurs de PyroGenesis attaché au projet, entre 5 à 10 emploies d’usine vont être créer. Dans une deuxième phase nous avons aussi contracté PyroGenesis pour qu’ils opèrent pour nous l’usine pendant 10 mois, ou jusqu'à nous ayons la certitude que les équipements peuvent produire le matériel, et cela pendant au mois 7 jours de suite en opérant 20 heures par jour. Les couts de cette phase durant une période de 10 mois sont de $ 2 310 000. Durant la phase de rodage et opérations de l’usine, en plus de l’équipe de 5 chercheurs de PyroGenesis attaché au projet, entre 5 à 10 emplois à temps pleins devait être créé dans l’usine. Donc nous sommes à la recherche de subventions ou de prêts de $4,0 Millions en vertu du programme Créativité Québec pour le financement de la construction de l’usine pilote. De plus nous aimerions savoir si il existe des programmes qui pourraient nous financer une partie des $ 2 310 000 relié à l’opération de l’usine lors de la période de rodage.


We are working with Montreal-based PyroGenesis Canada Inc to develop a unique technology, PUREVAPTM QRR (Patent Pending), a technology that transforms low-purity Quartz (SiO2 <99%) into very high-purity silicon metal (99.9999 % Si), basic material for the manufacture of solar panels. With laboratory test results demonstrating that the process is working, we are advancing the project to the next stage of development, which is the validation of the process on an industrial scale. In addition to validating the commerciality of the project, the pilot plant will serve as a test tank to validate that the process should reduce the production of Co2 by 75% in the production of very high purity silicon metal (99.9999% Si) versus traditional processes available on the market. To achieve this, we have mandated PyroGenesis to build a pilot plant of 200 tonnes per year based on our PUREVAP ™ QRR (Patent Pending) technology. Total construction costs are $ 4,950,000 divided as follows: • $ 4,430,000 for the purchase of equipment from the pilot plant, and • $ 520,000 for payment of salaries and direct operating costs of the plant During the warm-up period of the equipment. The construction of the pilot plant, its assembly and its operation will be done in Montreal, in the very premises of PyroGenesis. During the construction phase of the equipment, in addition to the team of 5 PyroGenesis researchers attached to the project, between 5 to 10 factory employees will be created. In a second phase we also contracted PyroGenesis to operate for us factory for 10 months, or until we are certain that the equipment can produce the material, and this for 7 consecutive days by operating 20 hours a day. The costs of this phase over a period of 10 months are $ 2,310,000. During the running-in phase and operations of the plant, in addition to the team of 5 PyroGenesis researchers attached to the project, between 5 to 10 jobs Full time had to be created in the factory. So we are looking for grants or loans of $ 4.0 million under the Creativity Quebec program to finance the construction of the pilot plant. Furthermore, we would like to know if there are programs that could finance us part of the $ 2,310,000 related to the operation of the plant during the running-in period.

Please login to post a reply
renaissance
City
Montréal
Rank
President
Activity Points
10252
Rating
Your Rating
Date Joined
10/08/2007
Social Links
Private Message
HPQ-Silicon Resources Inc.
Symbol
HPQ
Exchange
TSX-V
Shares
148 605 845 as of 12/23/2016
Industry
Metals & Minerals
Website
Create a Post