Connacher Oil and Gas

Welcome to the Connacher Oil and Gas Hub on AGORACOM
PDP
over 14 years ago
0
NAVPS
over 14 years ago
0
in response to MarlboroDog's message

Hi MarlboroDog;

There was a press release this morning explaining that it appears that sand has once again gotten into the tubing during their last test on February 18th, and that they are putting a cement plug in the well bore above the CDO oil strata that they wanted to test and that once this is done they will move uphole and test the Porquero strata instead. I have included the press release below:

"News from CNW Group

Petrolifera Petroleum Limited Updates Status of La Pinta 1X Testing Program

08:34 EST Monday, February 22, 2010

CALGARY, Feb. 22 /CNW/ - Petrolifera Petroleum Limited (PDP-TSX) announced today that upon opening the La Pinta 1X well to flow on test on February 18, 2010, following the installation of two inch screens to impede the influx of sand from the upper 25 foot interval of the Cienaga de Oro ("CDO") crude-oil bearing formation being tested in the well, the well ceased to flow after approximately three hours of flow, likely again due to sanding issues. Subsequent static gradient analysis indicated that the upper portion of the fluid influx into the tubing was hydrocarbons, with the balance likely mud or some combination thereof.

In order to attempt to secure a definitive test of the crude oil-bearing CDO, the company's management and advisors have reexamined and assessed the various available alternatives. These primarily included another more complex operation to re-test the CDO, or the drilling of a sidetrack to again penetrate and then test the full CDO interval which was indicated to be hydrocarbon-bearing and yielded light gravity crude oil on test. Drilling a sidetrack would also have afforded the company with the prospective ability to preplan the availability of enhanced sand control techniques, as a result of key learnings from efforts to date to secure a longer-term test the CDO formation in the La Pinta 1X well. Having regard to economic and financial factors, the perceived technical risk and assessment of the overall chance of success of these two choices, it was concluded that neither of these two alternatives were viable at this time.

Accordingly, a decision has been made to set a cement plug above the CDO and then to move uphole to test a zone in the Upper Porquero Formation. This zone was determined to be prospective based on log analysis and shows of crude oil and natural gas during the drilling of the well. If the Upper Porquero test is successful, efforts will be made to complete the well to evaluate its commercial potential. It should be noted under these circumstances that a new well bore would be needed to evaluate the deeper CDO. Alternatively, if testing of the Upper Porquero disappoints, we could still consider a sidetrack to penetrate and test the full CDO at a later date.

These procedures will be initiated as quickly as possible, using the snubbing unit still available and on location at the La Pinta 1X well.

While the company's management is disappointed that more meaningful data about the CDO could not be secured at this time, its potential has been established and may be further evaluated and confirmed at a later date with lower risk. In the interim, testing of the Upper Porquero is considered to be technically and financially prudent at this time."

Best wishes; Scott

Please login to post a reply
Road_Warrior
City
Richmond Hill, ON
Rank
President
Activity Points
3725
Rating
Your Rating
Date Joined
09/29/2008
Social Links
Private Message
Connacher Oil and Gas
Symbol
CLL
Exchange
TSX
Shares
403,000,000
Industry
Energy & Environment
Create a Post