Fire River announced continued high grade gold results of 144 (4.2 opt) gold over 2.5 metres (8.2 ft) in hole N07U065 from the ongoing re-evaluation program on the Nixon Fork Gold Mine Project in Alaska. The Company has received assay results and completed careful review of two holes completed in 2007 (N07U063 to N07U065).
New significant intercepts include 108 g/t (3.15 opt) gold over 3.0 metres (9.8 ft) in hole N07U063 and 144 g/t (4.2 opt) gold over 2.5 m (8.2 ft) in hole N07U065 including 508 g/t (14.8 opt) gold over 0.7 metres (2.3 ft) as part of the ongoing geological re-evaluation program for the Nixon Fork Gold Mine Project in Alaska.
- Results pending for 22 additional underground holes and 7 additional surface holes
- 2010 drill campaign scheduled to begin early July
- Resource update Fall 2010
IR Hub / Company Profile / Discussion Forum