Hopefully below will provide some calrity as to how much money has been spent and how much is needed going forward to get to The FS. Excerpt from RE release :

The Claim Block 4F Property hosts a significant hydrothermal graphite deposit and merits considerable work.

RPA recommends a Phase 1 budget of C$4.21 million (Table 26-1) to advance the Albany graphite deposit and explore elsewhere on the Property. Work should include:

A Preliminary Economic Assessment; • 1,200 m of drilling for geotechnical purposes; • a marketing study; • continued metallurgical testwork; • various social and environmental baseline studies; and • 5,000 m of drilling to define the extents of the deposit.

TABLE 26-1 PROPOSED BUDGET Zenyatta Ventures Ltd. - Albany Graphite Deposit

Item C$ Preliminary Economic Assessment 150,000

Marketing Study 100,000

Metallurgical Testwork 1,150,000

Social Study 50,000

Environmental Studies 250,000

Geotechnical Study Including Drilling 360,000 Drilling (5,000 m at $300/m total cost) 1,500,000

Operating costs/office 250,000

Sub-total 3,810,000

Contingency 400,000

Total 4,210,000

The recommended Phase 2 budget of C$5 million would be contingent on Phase 1 results. Work would include additional drilling, metallurgical testwork, and a Preliminary Feasibility Study.

Please login to post a reply
Packfan1941
City
Rank
Vice President
Activity Points
816
Rating
Your Rating
Date Joined
03/14/2014
Social Links
Private Message
Zenyatta Ventures Ltd
Symbol
ZEN
Exchange
TSX-V
Shares
62,884,284
Industry
Metals & Minerals
Create a Post