Zenyatta Ventures Ltd

in response to LTGoldBull2's message

"Zen has also taken x2 5 tonne samples well over a year ago, one from each of the Hydrothermal Pipes, (not the Vein type at Millar which is similar to Sri Lankan) for Metallurgical Testing......."

So, is that a total of 10 tonnes (x2 5 tonnes) of ore?

This would imply that Zen could theoretically produce roughly 400 kg of graphite (4% grade, 100% recovery), does it not?

Any idea how much has been produced and how much ore is left to support the continuing SGS metallurgical work?

Please login to post a reply
borne2run
City
Rank
Mail Room
Activity Points
130
Rating
Your Rating
Date Joined
02/03/2015
Social Links
Private Message
Zenyatta Ventures Ltd
Symbol
ZEN
Exchange
TSX-V
Shares
62,884,284
Industry
Metals & Minerals
Create a Post