Falcon Oil and Gas Ltd.

Welcome To The Falcon Oil and Gas HUB On AGORACOM A global energy company with projects in Hungary, Australia & South Africa
in response to solyomtwo's message

> They sure expect a lot of gas from the Földeák-1 :)

Just to get an idea of how much capacity a 12" line has, here's an interesting part of a 1995 article about the gathering lines at Jonah:

"A lagging infrastructure, coupled with the dramatic increase in production from Jonah Field, has kept Jonah Gas Gathering busy. When development action heated up in 1996, an existing 8-inch line was replaced with a 12-inch O.D. line having 100 MMcf/d capacity."

If the plan is to drill multiple wells from the Foldeak-1 pad, then a 12" makes sense. With an IP rate of say 10 mmcf day declining to 3 or 4, times 24 wells from 1 pad, thats 96 mmcf/day.

I would also imagine it doesnt cost all that much more to install a 12" line than it would to install a 2" one.






Please login to post a reply
lanman1
City
Earth
Rank
President
Activity Points
11055
Rating
Your Rating
Date Joined
12/21/2008
Social Links
Private Message
Falcon Oil and Gas Ltd.
Symbol
FO
Exchange
TSX-V
Shares
921,537,517
Industry
Energy & Environment
Create a Post