Connacher Oil and Gas

Welcome to the Connacher Oil and Gas Hub on AGORACOM
in response to rebels1's message

Connachers SP will be determined between now and completion by the following factors:

1. Price of oil.

2. The manipulation by the MoMo boys.

3. The performance of POD 1. ( Needs to move toward design capacity of 10,000 BBL/Day.)

4. Progress rate on and ultimate effectiveness of Algar.

5. State of worldwide rate of consumption of oil. Which is of course dependent on the underlying economic world health.

It is with a large dose of skepticism that I believe any here, myself included, can speak authoritatively as to the myriad potentials all of these factors pose as to the effect on Connacher SP. In other words, pure unfounded speculation as to SP over time!

Brian

Please login to post a reply
BKM8572
City
Rank
President
Activity Points
4789
Rating
Your Rating
Date Joined
01/27/2008
Social Links
Private Message
Connacher Oil and Gas
Symbol
CLL
Exchange
TSX
Shares
403,000,000
Industry
Energy & Environment
Create a Post